Oh, and by the way,,,
The lightning protection system is usually included on the projects as a result of the risk assessment process described in NFPA 780. That risk assessment is then reviewed by who? The owner's insurance carrier, or if appropriate, Factory Mutual. They will evaluate the risk assessment and determine premiums based on whether or not a master label system is installed. If a system is to be installed, then NFPA 780 must be adhered to. Don't blame UL for the cost or requirement. Mike
|