The electrical contractor should pull the permit, meg all circuits, and replace the damaged equipment. The project should be supervised by a master electrician. It is probably cheapeer to replace switches and receptacles than it would be to test them. Fans and lighting fixtures can be function tested and verified that the case is grounded and isolated from hot and neutral, or replaced. The panelboard may also require replacement depending on the damage, soot must be removed if possible, or replaced. dsullivan57
|