This article was posted 09/15/2006 and is most likely outdated.

Grounding versus Bonding: 250.148 Continuity and Attachment of Equipment Grounding (Bonding) Conductors to Boxes
 

 
Topic - Grounding versus Bonding: 250.148 Continuity and Attachment of Equipment Grounding (Bonding) Conductors to Boxes.

September 15, 2006  

| Ask a Question |  Code Graphic Code Quiz - All New! |  Free Stuff Instructors | Feedback
Online Training Products | Seminars | SubscribeUnsubscribe |
Change Email Address |
[ image1 Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

PART VII.   Hi Res - Cable/DSL [4513Kb]
VIEWING Video FILE requires
Real Media Player [ FREE ]
  
Sections

250.148 Continuity and Attachment of Equipment Grounding (Bonding) Conductors to Boxes.

Equipment grounding (bonding) conductors associated with circuit conductors that are spliced or terminated on equipment within a metal outlet box, must be spliced together or joined to the box with devices suitable for the purpose. Figure 250–193

Exception: The equipment grounding (bonding) conductor for isolated ground receptacles [250.146(D)] isn’t required to terminate to the metal outlet box.

(A) Splicing. Equipment grounding (bonding) conductors must be spliced with a listed splicing device that is identified for the purpose [110.14(B)]. Figure 250–194

Author’s Comment: Wire connectors of any color can be used with equipment grounding (bonding) conductor splices, but green wire connectors can only be used with equipment grounding (bonding) conductors.
(B) Grounding (Bonding) Continuity. Equipment grounding (bonding) connections must be made so that the disconnection or the removal of a receptacle, luminaire, or other device will not interrupt the effective ground-fault current path. Figure 250–195

(C) Metal Boxes. Where equipment grounding (bonding) conductors enter a metal box, they must be bonded to the box by a screw or device (i.e. ground clip) that is not used for any other purpose. Figure 250–196

Author’s Comment: Equipment grounding (bonding) conductors aren’t permitted to terminate to a cable clamp or screw that secures the plaster (mud) ring to the box. Figure 250–197



Figure 250–193
(Click on image to enlarge)


Figure 250–194
(Click on image to enlarge)


Figure 250–195
(Click on image to enlarge)


Figure 250–196
(Click on image to enlarge)


Figure 250–197
(Click on image to enlarge)

[ View More Newsletters ] [ Send to a Friend ] [ Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © 2002, 2003, 2004, 2005, 2006 Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

To suggest a topic or submit content for a newsletter: nlsuggest@mikeholt.com
Experiencing a Problem? Contact our Webmaster

Comments
  • Please note: Sheet metal screws are not permitted , as were in the past.

    P. Alex McKinstry

Reply to this comment
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter