This article was posted 09/06/2006 and is most likely outdated.

Understanding the NEC Rules for Backup Power Systems Part 1 of 4
 

 
Subject - Understanding the NEC Rules for Backup Power Systems – Part 1 of 4

September 6, 2006  

| Ask a Question |  Code Graphic Code Quiz - All New! |  Free Stuff Instructors | Feedback
Online Training Products | Seminars | SubscribeUnsubscribe |
Change Email Address |
[ image1 Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

 

Understanding the NEC Rules for

Backup Power Systems – Part 1 of 4

 

Download Part 1

 

imageWe at Mike Holt Enterprises try to provide as much as we can to the industry at no charge. For this reason we’ve created a free Understanding the NEC Rules for Backup Power Systems textbook. The material in this textbook was extracted from Mike's Understanding the 2005 NEC textbook.

 

Emergency and standby power systems are those that supply power to certain loads when the normal supply of electricity (typically a utility service) to a building or other structure fails. The National Electrical Code has three primary articles providing requirements for these backup power systems:

Article 700—Emergency Systems

Article 701—Legally Required Standby Systems

Article 702—Optional Standby Systems

 

In addition to these three specialized articles, many other NEC requirements also apply to the installation of emergency and standby power systems—rules in other articles dealing with conductors and raceways, branch circuits and feeders, grounding, enclosures, working space around electrical equipment, and much, much more. This free PDF download from Mike Holt Enterprises gives you the “big picture” overview of everything you need to know about installing Code-compliant emergency and standby power systems.

 

Because of the size of the textbook we’ve decided to make it available in four parts. We will be sending these parts out over the next 3 months. Here is Part 1.

 

Scope of Part 1 of 4 - Articles 90 and 110

 

Scope of Part 2 of 4 - Articles 220, 230 and 240

 

Scope of Part 3 of 4 – Article 250

 

Scope of Part 4 of 4 - Articles 300, 310, 312, 408, 445, 700, 701, 702, Chapter 9 and Annex C

 

Click here or on the image above to download Part 1 (7.56 MB), but be advised that this download may take a few minutes to download depending on your internet connection speed. If you encounter a problem opening this file, be sure you have the latest version of Adobe Acrobat installed on your system (click here).

 

Next month will be sending Part 2, stay tuned.

 

 

[ View More Newsletters ] [ Send to a Friend ] [ Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © 2002, 2003, 2004, 2005, 2006 Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

To suggest a topic or submit content for a newsletter: nlsuggest@mikeholt.com
Experiencing a Problem? Contact our Webmaster

Comments
  • Mike Holt the only true expert in NEC. You rock.

    Dan SimS

Reply to this comment
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter