A continuity test of all bonding and grounding should be a requirement forced on the contractor before anyone can say a pool is safe to go in many of these contractors go pull a permit and relay on the actual electrician the Inspector is the last line of defense and he is not their all the time to see actual installations.? Jose A. Guillen June 11 2016, 4:29 pm EDT
|