This article was posted 06/29/2006 and is most likely outdated.

Top 101 NEC Rules – Part 2 of 4
 

 
Subject - Top 101 NEC Rules – Part 2 of 4

June 29, 2006  

| Ask a Question |  Code Graphic Code Quiz - All New! |  Free Stuff Instructors | Feedback
Online Training Products | Seminars | SubscribeUnsubscribe |
Change Email Address |
[ image1 Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

Top 101 NEC Rules – Part 2 of 4

 

imageWe at Mike Holt Enterprises try to provide as much as we can to the industry at no charge. For this reason we’ve created a free “Top 101 NEC Rules” textbook. The material in this textbook was extracted from Mike's Understanding the 2005 NEC textbook.

 

Because of the size of the textbook we’ve decided to make it available in four parts. Last month we made Part 1 available, and now you can download Part 2:

 

Details of Part 2

Rule 26—225.32 Disconnect Location

Rule 27—225.33 Maximum Number of Disconnects

Rule 28—225.34 Grouping of Disconnects

Rule 29—230.2 Number of Services

Rule 30—230.6 Conductors Considered Outside a Building

Rule 31—230.71 Number of Disconnects

Rule 32—230.72 Grouping of Disconnects

Rule 33—240.4 Protection of Conductors

Rule 34—240.6 Standard Ampere Ratings

Rule 35—240.21 Overcurrent Protection Location in Circuit

Rule 36—250.2 Definitions

Rule 37—250.4 General Requirements for Grounding and Bonding

Rule 38—250.6 Objectionable Current

Rule 39—250.24 Grounding and Bonding at Service Equipment

Rule 40—250.30 Grounding and Bonding of Separately Derived AC Systems

Rule 41—250.32 Buildings or Structures Supplied by a Feeder or Branch Circuit

Rule 42—250.34 Generators—Portable and Vehicle-Mounted

Rule 43—250.50 Grounding Electrode System

Rule 44—250.52 Grounding (Earthing) Electrodes

Rule 45—250.53 Installation of Grounding Electrode System

Rule 46—250.54 Supplementary Electrodes

Rule 47—250.56 Resistance of Ground Rod Electrode

Rule 48—250.64 Grounding Electrode Conductor Installation

Rule 49—250.66 Grounding Electrode Conductor—Size

Rule 50—250.92 Service Bonding

 

Click here or on the image above to download Part 2 (8.25 MB), but be advised that this download may take a few minutes to download depending on your internet connection speed. If you encounter a problem opening this file, be sure you have the latest version of Adobe Acrobat installed on your system (click here).

 

PS: If you missed Part 1, you can click here to download it now.

[ View More Newsletters ] [ Please Reply With Your Comments | View Comments | Notify Me When Comments Are Added ]

F o r w a r d   t h i s   N e w s l e t t e r   t o   a   F r i e n d !
Do you have a friend, relative, or colleague who you think would be interested in receiving this free newsletter? If so, we encourage you to forward this message along to them. If you received this email from someone else, and wish to receive your own free issues of our newsletter, sign up today!

C o n t a c t    I n f o r m a t i o n
 

Copyright © 2002, 2003, 2004, 2005, 2006 Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Comments
  • I love this 4 part rules of the electric code, I have been studying this code for 6 monthe took the exam missed it by 1!!!!!!!!!!! Went back the next week and missed by two!!!!!!!!!! This is a format with pictures that it easy to read and understand.

    Thank You so much for your efforts. Kathy Toohey

    Kathy Toohey

Reply to this comment
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter