I have existing UG, concrete encased, conduits that stub up 4" above grade, below a power distribution bldg. The bldg is approx. 24 inches above the grade. The bldg is in a non-classified area and the conduits go into a Class I, Div 2 area.
There are conduits that terminate with a female coupling that is even with the top of(or 1" above)the duct bank and a conduit screwed into this, then terminates into an approved "sealing" hub at the floor of the bldg.
Does this meet the code requirement?
Some of the conduits extend past the top of the concrete(no couplings), then aa approved seal is installed, then conduit to a hub at the bldg floor. Those adhere to the code requirement.
The UG conduits travel approx. 25ft before they enter the "boundry" of the CL1,Div2 area. Where the conduits stub up inside(25ft-100ft)the Cl1,Div2 area, they have seals.
Your comments are appreciated and welcomed. John Z
|