Light Pole Safety Testing
 

 

Topic - Grounding vs Bonding
Subject - Light Pole Safety Testing

January 27, 2009
This newsletter was sent to 30954 newsletter subscribers

Ask a Question |  Weekly Code GraphicQuizzes |  Free Stuff InstructorsOnline Training Products | Seminars | SubscribeUnsubscribe
[ image1 Post Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

Light Pole Safety Testing

 

Each year a handful of people are electrocuted, and hundreds more report being Imageshocked, due to electrical wiring problems associated with street and highway lighting systems. Most of these faults would have been safely cleared if the equipment grounding conductors and bonding systems were properly installed and maintained. It is not practical, nor is it cost effective, to test grounding conductors and bonding connections on large-scale lighting systems. Instead, electrical safety pole audits have been used successfully in New York State and Massachusetts for three years to identify these publicly accessible electrical hazards. The findings so far show that the problem is much more extensive than originally thought- initial pole audits show that one in every 337 light poles is unsafe. This article describes the typical pole audit and points out lessons learned from the field.

 

Click here to download this article by Mark Voigtsberger, VP of Operations, Power Quality Testing.

 

Click here to post a comment
[ View More Newsletters ] [ Send to a Friend ] [ Post Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Experiencing a Problem? Click Here

 
Comments
  • Until the department responsible for the public lighting in any location is absolutly and positivley held responsible for the proper maintainence of systems this will unfortunately continue. There should be no sub then sub contracting allowed for this paticular situation. Each municipality has a public works department with and electrical division. Cut and dry, they should be responsible for their municipality. Cut some administrative fat, get the required amount of funds and personnel to maintain the problems. End of story.

    Anthony

Reply to this comment
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter