Electrical Services, Part 2

 

By Mike Holt – a short summary of the requirements contained in the Understanding the 2008 NEC, Volume 1 Textbook.

Understand the requirements for service-entrance conductors and service equipment.

Looking at Table 230.1, we can see that the second and third major areas of Article 230 provide requirements for service-entrance conductors (Part IV) and service equipment (Parts V, VI, and VII).

Service entrance conductors

Before you begin a service installation, determine which conductors are actually part of the service (line side of the service equipment) rather than feeders and branch circuits (load side of the service equipment).

Each service drop or service lateral can supply only one set of service-entrance conductors [230.40], but, there are five exceptions:

  • Exception No. 1: A building with more than one occupancy can have service-entrance conductors for each occupancy. This exception commonly applies to strip malls and even to duplexes, triplexes, and other multiple-family buildings (e.g., apartment houses) to allow locating metering equipment at or near the end of the service drop or service lateral instead of at multiple locations. The rules on the location and grouping of service disconnecting means in 230.71 and 230.72 still apply.
  • Exception No. 2: Service-entrance conductors can supply two to six service disconnecting means as permitted in 230.71(A).
  • Exception No. 3: A single-family dwelling unit with a separate structure, such as a garage, can have one set of service-entrance conductors run to each structure from a single service drop or lateral.
  • Exception No. 5: One set of service-entrance conductors connected to the supply side of the normal service disconnecting means can supply standby power systems, fire pump equipment, fire and sprinkler alarms, and alternate power sources like fuel cells and solar photovoltaic systems [230.82(5) and (6)].

Size and Rating

Service-entrance conductors must have sufficient ampacity for the loads, per Parts III, IV, or V of Article 220 [230.42].

Before applying any adjustment or correction factors, size the service-entrance conductors at least 125 percent of the continuous loads, plus 100 percent of the noncontinuous loads. Base your calculations on the terminal temperature rating ampacities listed in Table 310.16 [110.14(C)].

Size the neutral conductor to carry the maximum unbalanced load per 220.61. It also can’t be smaller than required by 250.24(C) [230.42(C)].

Wiring methods

You can use any of the sixteen wiring methods listed in 230.43 for installing service conductors. Follow the applicable Chapter 3 requirements for the wiring method you choose (for example, Article 358 for EMT). You can also use cable trays, if they contain only service-entrance conductors, or if they have a barrier that separates the service conductors from the feeders or branch circuits [230.44].

Splices and taps must comply with 110.14, 300.5(E), 300.13, and 300.15 [230.46].

Protection from physical damage

Protect underground conductors from physical damage per 300.5 [230.50(A)]. For all other conductors, install in IMC, RMC, Schedule 80 PVC, or EMT (per Articles 342, 344, 352, and 358 respectively) or use other means approved by the AHJ.

Raceways for overhead service drops must have a weatherhead [230.54]. So must service cables, but you can form SE cable into a gooseneck and tape it with self-sealing weather-resistant thermoplastic. Be sure to support the cables within 1 ft of the weatherhead, raceway connections, or enclosure, and at intervals not exceeding 30 in. [230.51].

Locate service heads and goosenecks above the point of attachment, per 230.26. But where it’s impractical to locate the service head above the point of attachment, locate within 2 ft of the point of attachment [230.54(C)].

Service heads must provide a bushed opening, and ungrounded conductors must be in separate openings. Drip loop conductors must be below the service head or below the termination of the service-entrance cable sheath. Arrange service drops and service-entrance conductors to prevent water from entering service equipment.

Service disconnect

The service disconnecting means must consist of either a manually operated switch, or a power-operated switch or circuit breaker also capable of being operated manually [230.76]. It must open all service-entrance conductors from the premises wiring of the structure [230.70].

A shunt-trip button does not qualify as a service disconnect because it doesn’t meet any of the above requirements.

Install the service disconnecting means at a readily accessible location nearest the point of service conductor entry (either inside or outside the structure) [230.70(A)(1)]. In a multiple-occupancy building, each occupant must have access to their service disconnecting means [230.72(C)]. But if electrical maintenance is provided by continuous building management, the service disconnecting means can be accessible only to building management personnel.

Because service-entrance conductors don’t have short-circuit or ground-fault protection, they must be limited in length when installed inside a building. Some local jurisdictions have specific length requirements.

You can have a maximum of six service disconnects for each service permitted by 230.2, or each set of service-entrance conductors permitted by 230.40 Ex 1, 3, 4, or 5 [230.71]. This is per service, not per building. Make sure these are grouped per 230.72.

Disconnect rating

The service disconnecting means must have an ampere rating of at least the calculated load per Article 220 [230.79], and the rating of the disconnecting means must be at least:

  • 15A for installations consisting of a single branch circuit.
  • 30A for installations consisting of two 2-wire branch circuits.
  • 100A for a one-family dwelling.
  • 60A for all other installations.

Disconnect supply side connections

Don’t connect any electrical equipment to the supply side of the service disconnect, except for [230.82]:

  1. Cable limiters or other current-limiting devices
  2. Meters and meter sockets.
  3. Meter disconnect switches that have a short-circuit current rating at least that of the available short-circuit current. Any such switch must be capable of interrupting the load served.
  4. Type 1 surge protective devices (listed to be permanently connected on the line side of service equipment [285.23]).
  5. Taps for legally required [701] and optional standby [702] power systems, fire pump equipment, fire and sprinkler alarms, and load (energy) management devices.
  6. Solar photovoltaic systems, fuel cell systems, and interconnected electric power production sources.
  7. Control circuits for power-operable service disconnecting means, if provided with suitable overcurrent protection and disconnecting means.
  8. Ground fault protection systems or Type 2 surge-protective devices (if listed as part of the equipment).

Service equipment overcurrent protection

The NEC doesn’t require you to provide short-circuit or ground-fault protection for service conductors, but the feeder overcurrent device provides overload protection for the service conductors.

Each ungrounded service conductor must have overload protection at the point where the service conductors terminate [230.90 and 240.21(D)].

The rating of the overcurrent device must not exceed the ampacity of the conductors. See the five exceptions noted in 230.90(A).

Equipment ground-fault protection

You must provide equipment ground-fault protection for each service disconnecting means rated 1,000A or more, if it’s supplied by a 4-wire, three-phase, 277/480V wye-connected system [230.95]. The rating of the service disconnecting means is considered to be the rating of the largest fuse that can be installed or the highest continuous current trip setting of a circuit breaker.

The NEC prohibits ground-fault protection of equipment for fire pumps [695.6(H)], and doesn’t require it for emergency systems [700.26] or legally required standby systems [701.17].

Article 100 defines “Ground-Fault Protection of Equipment” as a system intended to provide protection of equipment from ground faults by opening the overcurrent device at current levels less than those required to protect conductors from damage. This type of protective system is intended to protect connected equipment, not people. See 215.10 for similar requirements for feeders.

To install a service correctly, you must comply with all of Article 230, and that can seem overwhelming initially. But if you first address the conductors and then the equipment, you’ll find it easier to get your head around these requirements for any given project.

If you’re developing the work breakdown structure (WBS) for a service installation project, refer to Figure 230.1 during that process. This will help you keep your WBS useful, rather than missing a key task or becoming overly detailed.

Key Definitions

  • Service Point. The point of connection between the serving utility and the premises wiring.
  • Service Conductors. The conductors from the service point to the service equipment (the service disconnecting means, not the meter). Service-entrance conductors may be either overhead (service drop) or underground (service lateral), or there might not be any at all.
  • Service Equipment. The necessary equipment, usually consisting of circuit breakers or switches and fuses and their accessories, connected to the load end of service conductors at a structure (or an otherwise designated area), and intended to constitute the main control and cutoff of the electrical supply. Service equipment doesn’t include metering components, such as the meter and meter socket enclosure [230.66].

To purchase Mike Holt’s Understanding the 2008 NEC, Volume 1 textbook, please click here, or call our office at 888-632-2633 for more information.

 

Click here to post a comment
[ View More Newsletters ] [ Send to a Friend ] [ Post Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Experiencing a Problem? Click Here

 
Comments
  • INSPECTOR M. HOLT

    THANKS YOU FOR SEVICES OVER THE YEARS,

    INSPECTOR K.WEST PHILA,PA SPRINGHILL,FL

    KENN WEST
    Reply to this comment

  • Under 230.71 (A) where it permitts the use of 6 or less switches instead of a service disconnect, some inspectors interpret that section as to mean that if a panel was capable of taking more than 6 switches than a service disconnect was required even though the electrician was installing less then 6 switches.Can you please address this section? Thank You

    FRED VALENTE
    Reply to this comment

  • Some places such as Summit County, Ohio have banned direct burial electrical services. There were too many instances of the Tree Root Circuit Breaker Method and too many marijuana growers who were tapping direct burial cabler ahead of the meter.

    Direct burial electrical services break too easily and they are a big pain in the arse to fix. At least with schedule 80 PVC conduit from the padmount transformer to the meter a 3 man crew can replace the conductors in 1 day including using the Silicon Carbide Paper-Elbow Grease-Electrical grease method on all the wire strands.

    If somebody will not pay for conduit and the AHJ does not require it, I tell them to hire somebody else.

    Michael R. Cole
    Reply to this comment


Add Your Comments to this Newsletter
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter